Colorado Army National Guard Readiness Center

Category: Design and Analysis
Year: 2011
Status: archive Building Type: Misc
LEED: Platinum
Location: Windsor, CO

The Readiness Center for the Colorado Army National Guard was designed in 2011 by RB+B Architects.  Daylighting Innovations assisted with the daylighting design and analysis and the buildings LEED daylighting credits.  The daylighting goal of the project was to provide quality and useable light as possible into the building in a cost effective way that integrated with the buildings architecture.  Daylighting Innovations provided a series of simulations with different possibilites to compare each techniques effects to the total buildings performance in order to provide the best possible design suggestions.

Article about the project's collaborative design process in Environmental Design + Construction.  The daylighting turned out great!

Alt1_e12pm_hq_hallView Gallery