Casey Middle School

Category: Design and Analysis
Year: 2010
Status: archive Building Type: Schools (K-12)
LEED: Platinum
Location: Boulder, CO

Zack Rogers, working with Architectural Energy Corporation, provided daylighting design and analysis services to the RB+B led design team on the construction of the new Casey Middle School: a unique new construction that preserved two historic facades of the original school.  Zack also assisted the AEC commissioning team in calibrating the electric lighting control systems throughout the building.  The building features great daylight coverage, a ground-source heat pump system, a rooftop garden, pv bike awnings and a number of other sustainable features.

RB+B Casey Middle School Site